The driveway.

When we acquired the Mill, vehicular access was not possible. As part of the building work, gas and telephone cables were laid beneath the drive, a sanded surface was laid suitable for vehicles and an avenue of oak trees was planted.

The drive before construction began. October 2020

The drive before construction began. October 2020

The drive obstructed by a tree. View towards the street. October 2020

The drive obstructed by a tree. View towards the street. October 2020

Cables laid beneath the drive. October 2020

Cables laid beneath the drive. October 2020

Drive during construction. March 2021

Drive during construction. March 2021

Drive with oak trees and sand surface. April 2021

Drive with oak trees and sand surface. April 2021

Drive, view towards the road. April 2021

Drive, view towards the road. April 2021

Car park with granite paving. April 2021

Car park with granite paving. April 2021

Drive. June 2021

Drive. June 2021

Zurück
Zurück

Garden restoration

Weiter
Weiter

Conversion of the second floor